Forum quick links
Uploading of Construction Credits
posted by Stephen Sgro on
We are currently under preliminary design review on a LEED 2009 Schools (split review) project. We received LEED prelim.
Number of points awarded for RP
NC-v4 RPc1:Regional priorityposted by Amrit Kaur on
How can I find out how points I would get for a particular RP. Is it always only one point if I pass the threshold?
Achievement Rates for Exemplary Performance
NC-2009 MRc2:Construction waste managementposted by Francis Hernández on
Does LEED User have the achievement rates for exemplary performance of credits? We are a GC and currently have been awarded a project with a goal of achieving exemplary performance in constru
Pre Fab Building Compliance
NC-v4 EQc2:Low-emitting materialsposted by Kristen Magnuson on
Is it still possible to get 3 points for 5 compliant credit categories, if the building is entirely constructed off-site and then brought to the site and assembled?
Reapplying for credits
NC-2009 PIf2:Project Summary Detailsposted by jupiter luner on
We're getting ready to move onto construction phase.
Baseline Exterior Lighting Power Allowance
NC-2009 EAc1:Optimize energy performanceposted by Cory Duggin on
USGBC Addenda 100001062 updated the exterior lighting table for LEED v3 projects to the 90.1-2010 allowances. The addenda just says it updates credit SSc8 though.
Non roof measures
NC-v4 SSc5:Heat island reductionposted by Nithya Madan on
Is using mulch considered as a non roof measure under the heat island reduction category?
CARB ATCM and TSCA Title VI Test Results used for IEQc4.4?
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Melanie Blacklock on
My subcontractor has submitted a Test Report showing the MDF has passed the following:
Energy savings from Battery Storage
NC-2009 EAp2:Minimum energy performanceposted by Vinay Shekar on
Hello,
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."