Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Weekday met, but no weekend service. Partial points?

CI-v4 LTc3:Access to quality transit
posted by  Matt Nicholson  on 

The bus service near our project clearly meets the weekday requirements, but there is no bus service on the weekends in Salem, OR.

2
Principal
Viridis Sustainable Building Consultancy LLC
LEEDuser Premium Member
15 thumbs up
Wed Apr 25, 2018, 6:06 pm

Exterior composite wood covered?

NC-v4 EQc2:Low emitting materials
posted by  Craig Graber  on 

For non-HC or School projects, does this credit cover EXTERIOR composite wood? Credit requirements and Ref.

2
Tue Apr 24, 2018, 10:40 pm

Pneumatic Controls - Monitoring Based Cx

CI-v4 EAc1:Enhanced commissioning
posted by  Christopher Lim  on 

I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.

0

Confirm: Tenant WE calc can include Base Building rainwater system

CI-v4 WEp1:Indoor water use reduction
posted by  Brian Salazar  on 

Hello!  I have a CI project where the tenant occupies multiple contiguous floors.

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Apr 20, 2018, 2:13 am

ASHRAE 50% AEDG

CI-v4 EAc2:Optimize energy performance
posted by  AMY VAN DAM  on 

Can a project pursue the prescriptive compliance path if there is not a ASHRAE 50% Advanced Energy Design Guide that is specifically applicable to the base building (i.e.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 19, 2018, 9:00 pm

Can't create an ID point for this credit

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Alfonzo Collins  on 

I want to take an ID credit for having 100% of parking spaces under cover, but when I go to the ID credit form and try to select this credit for exemplary performance, it does not show up among the

5
Thu Apr 19, 2018, 2:19 pm

Building Products dont meet credit requirements?

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Emily Neal  on 

Our project is registering under V4-CI. We are having difficulty with the MR credits where it requires 20 different products, our project doesn't have 20 products to use.

3
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Tue Apr 17, 2018, 8:22 pm

Controllability of lighting in Stadiums / Arenas

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Stacey Olson  on 

I'm working on a project (2009 BD&C) that includes an outdoor open air stadium, and indoor facilities that include restrooms, circulation, concessions, team locker rooms, press rooms, etc. I r

3
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue Apr 17, 2018, 7:02 pm

Occupant Comfort Survey for residential projects?

NC-v4 INc1:Innovation
posted by  Erica Downs  on 

Under v3, residential projects were ineligible for this credit. Does anyone know if they are eligible under this v4 Innovation credit? Thanks!

2
Design Engineer
LEEDuser Expert
19 thumbs up
Tue Apr 17, 2018, 12:40 am

How to divert 70% of ongoing consumables?

EBOM-v4 MRc4:Solid waste management - ongoing
posted by  David Baker  on 

I have a project that is up for recertification next year and wants to pursue the MR credit for diverting ongoing consumables.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Apr 13, 2018, 2:55 am