I'm looking for some guidance regarding drafting policies. I've downloaded the USGBC templates, however do we need to include sections related to credits that we are not pursuing?

0

ASHRAE 90.1 Chilled Beams Compliance

General forums
posted by  Federico Taboada  on 

How can I know if a Chilled beam system for ventilation complies with the ASHRAE 90.1 2007 minimum efficiency requirements ? It has not been mentioned in the ASHRAE Standard.

1
Wed Dec 31, 2014, 1:18 am

Undisturbed site areas within LEED project boundary?

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Edgar Arevalo  on 

I have a project where a patch of forestry has been removed for a new university building.

1
Mon Aug 28, 2017, 1:30 pm

LEED CI Regional Priority Documentation

CI-2009 RPc1:Regional Priority
posted by  Bethany Beers  on 

It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.

1
Tue Mar 15, 2016, 7:53 pm

PTAC Monitoring

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Dutchie Grossweiner   on 

In a mixed use building, the residential dwelling units are being provided outdoor air via PTAC systems (apartment size determines the number of PTAC units).

1
Mon Oct 24, 2016, 1:41 pm

green power for residential hi-rise?

NC-2009 EAc6:Green power
posted by  Seonhee Kim  on 

Any proven strategy pursuing green power credit for residential hi-rise project? it is a rental property with separate utility meter to each unit. Any advice would be greatly appreciated!

1
Tue Aug 25, 2015, 1:35 pm

about flooring grout category in low-emitting materials

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Leslie Synnestvedt  on 

I am working on the low-emitting materials calculator and looking at the flooring system right now. I am a bit confused about the category that flooring grout falls into. For Option 1.

1
Fri Feb 10, 2017, 7:15 pm

Combined approach

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Claire DeCamp  on 

We have a project that is going to use a combined approach due to overhangs and the prescriptive calcs not providing enough SF. I have casually measured the spaces and we exceed 20fc.

1
Fri Dec 11, 2015, 12:56 pm

Toilet Building meet MPR?

NC-v4 MPR3:Must comply with project size requirements
posted by  Harry Flamm  on 

Does a stand-alone one-story building, of 1,600 sf, that contains just public toilets and sinks in a park setting, and no full-time occupancy, meet minimum program requirements for LEED v4 New Cons

1
Wed Apr 5, 2017, 4:31 pm

Ice Makers on LEED 2009 for Retail NC

Retail-NC-v2009 WEc3:Water use reduction
posted by  Nic Millard  on 

Are ice makers included in the WE 3 calculations since its Retail NC, we thought they were excluded for NC all together, but were not sure if this only applied to NC schools and core and shell.

1
Sat Aug 26, 2017, 11:56 pm