Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Individual task lighting

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  ethan adams  on 

Are rechargeable battery-powered task lighting units acceptable for this credit?

1
Wed Dec 9, 2015, 6:13 pm

Views exculsion for High Bay Window areas

Schools-2009 IEQc8.2:Daylight and Views—Views
posted by  David Sundersingh  on 

We are in the early stages of design for a Career Compact Center, this has 3 workshop areas with high bay windows for natural lighting.

1
Tue Apr 4, 2017, 5:37 pm

Rainwater Management

NC-v4 SSc4:Rainwater management
posted by  Hadar Farjo  on 

We our developing a brownfield site.There is no annual increase in runoff volume from the pre development cover condition to the post developed condition.

1
Fri Jul 14, 2017, 2:42 pm

Recycling estimates from similar projects

CS-v4 MRp1:Storage and collection of recyclables
posted by  Martin Stowell  on 

Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?

1
Tue Jan 17, 2017, 9:52 pm

Dormitory Views

NC-v4 EQc8:Quality views
posted by  Ryan White  on 

Hello, We are working on a dormitory and our window sills in the units are at 44" or 46". The view range is obviously 30"-90" aff but it also states specifically the 42" eye height.

0

sunset date for projects registered under LEEDv3

General forums
posted by  Gail Napell  on 

has anyone heard of a required completion date for projects registered under v3?

1
Tue Jul 26, 2016, 11:05 pm

Calculating Daily Average for Transient Users

NC-2009 PIf3:Occupant and Usage Data
posted by  Randy Weatherly  on 

Based on the examples presented on this site, the daily average is based on 365 days a year. Is this correct or should it be based on actual days the facility is open for business? Thanks

1
Tue Dec 15, 2015, 9:21 pm

Precertification - LEED 2009 Core & Shell

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Michael Heacock  on 

We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.

0

Injected foam insulation with 0 g/L VOCs

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Erin Holdenried  on 

I have a project using Injected foam insulation with 0 g/L VOCs. Does this product meet the credit intent? Or must it meet the specific CDHS testing requirements?

1
Thu Dec 17, 2015, 1:17 am

WEc1 - Lav Efficiency Floor?

CI-2009 WEc1:Water Use Reduction
posted by  Jeremy Knoll  on 

Is there a lower limit to the lav flow rate below 0.5gpm that USGBC will accept? I saw something posted on the EPA's website awhile back, but am not finding it now.

1
Mon Jan 30, 2017, 6:53 pm