Conveying systems now accepted for this credit
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
cabinet millwork
NC-2009 MRc7:Certified Woodposted by Karl Heitman on
We are installing plastic laminate millwork with particle board core which is not FSC certified. Does the cabinet costs need to be counted towards the total wood used in the project?
Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ed Kokosa on
I've seen previous versions of this question on the forum and the typical answer is to look at design information provided by diffuser manufacturers. As others have replied back, the standard is to
Furniture components assembled on-site
CI-2009 MRc5:Regional Materialsposted by Eric Thompson on
We have a project where elements of the furniture are coming to the jobsite and being assembled there.
RCI CORR Information
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by John Danby on
I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.
Wood Framed Attic and Roof
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Paul Silverberg on
Our project was the complete renovation of a small building with masonry exterior walls, a concrete slab on grade at the first floor and wood framing for the interior walls, 2nd floor, attic and ro
Annual Energy Cost
NC-2009 EAc2:On-Site Renewable Energyposted by Sarah Thompson on
I am trying to figure out which cost to put in here. Another post said it was savings, although I can't find anything under the credit intent or resources for this specific item.
Roof cleaning and water
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Kimberly Hosken on
If LEED reviewers are now rejecting hardscape management plans for using power washing (water), does anyone know if using "water" to clean our roof will be rejected?
Solar Reflectance of Porous Playground Paving Materials
NC-v4 SSc5:Heat island reductionposted by Steven Burke on
The reference guide does specifically mention that playgrounds are one of the non-roof areas that should receive shading, though after the one line where playgrounds are mentioned in parentheses, t
Additions While Project is in Certification Review Process
Schools-2009 PIf2:Project Summary Detailsposted by Robert Fiala on
We have a large school project (340,000 sf) that has been submitted for the design phase review and all design phase points are reviewed and marked as anticipated.