when we register a pilot credit....
Pilot-Credits EApc65:Monitoring based commissioningposted by Gail Napell on
we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance -
"Special Conditions" for baseline
NC-2009 WEc1:Water Efficient Landscapingposted by Ralph Bicknese on
For our current project, virtually 100% of landscaping is turfgrass using 62.5% efficient rotors, usually a difficult combination for achieving 50% reduction.
Base building HVAC Efficiency and Baseline & Proposed WWR
CI-v4 EAp2:Minimum energy performanceposted by ESD Engineer on
Hi, The projects space is served by the base building AHU and Chiller plants. Efficiency of which don't meet the min prescribed efficiency as per ASHRAE 90.1-2010.
v4 vs v2009, Bicycle Shower Facilities Location
NC-v4 LTc6:Bicycle facilitiesposted by Miles Thorne on
Sorry for the redundancy - v3 tips offered up the following: "Remember that bicycle storage and shower facilities must be exclusive to occupants for the project, or a sufficient quantity must be p
Campus
Pilot-Credits PC14:Walkable Streetsposted by Megan Recher on
We are applying the pilot credit in a campus setting, where the primary façade fronts a pedestrian plaza, as opposed to street.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
want to get information about previous LEED certified projects
NC-2009 PIf2:Project Summary Detailsposted by Amir Salehi on
Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,
Reduced parking footprint for College/University
NC-v4 LTc7:Reduced parking footprintposted by Iris Amdur on
The project is a single building which is part of a larger educational campus.
Updating documentation with consistent or more recent dates?
posted by Sara Goenner Curlee on
For various reasons, my project's Design Submittal got put on hold in 2014 after most of the work effort was done and uploaded to LEED Online.
Group Approach for EAp2 & EAc1 certification
NC-2009 EAp2:Minimum Energy Performanceposted by soham babu on
The question is related to Group Approach when we input two building details in minimum energy performance calculator, out of two building one of the building will not achieve the energy cost savin