Calculating Ds for LEED 62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by William Beechinor on
Hello, I am currently trying to calculated Ds for the cooling condition for a project I an working on.
Transients for complex occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by David Browne on
In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the building
Pursuing credits in recert that were denied during intial cert
posted by Alexa Stone on
Hi LEED Experts, My question pertains specifically to two credits in the LEED v2009 EBOM rating system, SSc3 & EQ3.6. These two credits were denied during the original certification.
Budget Method
NC-v4 EQc2:Low emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
short term bicycle storage
NC-v4 LTc6:Bicycle facilitiesposted by sue bryant on
Can this be located inside a building as long as it is within 100' of the main entrance?
2009 BD+C and 2009 CS on Campus site- SSc4.2
posted by Deborah Lucking on
SSc4.2 is listed as a "Campus" credit. However, we have one project that is pursuing Major Renovation, and another pursuing Core & Shell certification.
Download Forms
NC-2009 PIf1:Minimum Program Requirementsposted by Ralph Bicknese on
Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef
Proximity to rail station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Sheryl Swartzle on
Our one and only bus, which stops right outside our project entrance, is a 10 minute drive in heavy traffic (meaning many rides would be less than 10 minutes) but 3.5 miles to a Metro Rail station.
Tint to Reduce Glare
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sara Zoumbaris on
We have a project that, after occupancy has taken place, would like to install a tinted film on some of the southern facing windows to reduce glare in work spaces.
Site lighting calculations
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We have a campus projects with three relatively equal size multi-story buildings. The owner will manage the three buildings separately. Each project will pay for their own utilities.