Post construction AND Post Occupancy Flush Out
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Denise Domino on
3.2 IAQ Mgmt. Plan - What are your options if neither Option 1 or 2 were done?
PLF4 was not approved because ..& recommendation for final submi
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Plf4 was not approved because GBCI is asking int & ext photos & renderings of the building. This was Design Preliminary submission and construction has just started.
Regularily Occupied or not?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Alex Barrera on
I'm working on an industrial building in Virginia. One of the rooms is a Quiet/Sleep room, where employees can rest in between their shifts.
Site adjacent to 5 lane highway - with no On-0ff ramp.
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Joyce Kelly on
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo
Performance Period
EBOM-v4 WEp2:Building-level water meteringposted by Matthew Hanks on
I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?
EAp2 Energy Equipment form
CI-2009 EAp2:Minimum Energy Performanceposted by Steve Zuwala on
When listing non-energy star equipment we enter N/A in the Make or model column.
Demolished Building - Material Reuse
NC-2009 MRc3:Materials Reuseposted by Lauren Bellamy on
Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.
phases of project & VOCs
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Debra a. Lombard on
we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for
Bake Out?
NC-v4 EQc3:Construction indoor air quality management planposted by Rosemary Ziemann on
Hello, Is the strategy of using a "bake out" to remove VOCs from interior building materials advisable?
supplemental heating system
CS-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.