Forum quick links
car wash by hand (manual car wash) at a car dealership
CI-v4 WEp1:Indoor water use reductionposted by Kristen Magnuson on
Community, I am assuming we are safe to exclude a sink being used for a manual car washing station (hand-wash carwash) at a car dealership.
Providing water quality treatment to meet credit requirements
CS-v4 SSc4:Rainwater managementposted by Martin Stowell on
Our project provides water quality treatment of a majority of the stormwater prior to discharging from the stormwater best management practices at the site.
Site Management-Organic Waste Management
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Manufacturing projects need to consider organic waste management?
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Donny Goris-Kolb on
Guidance states "If restrooms are not provided for customers within the retail project,.." If the store's restrooms are intended for employee use, but employees are directed to grant customers acce
is a tenant lease agreement applicable here?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Alfonzo Collins on
I am working on a C&S office building, and I'm reading differing viewpoints on this credit and IEQc8.2. Must these credits be included in the Tenant Lease agreement?
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
Contacting the USGBC and Combining Tenant Spaces
CI-2009 PIf1:Minimum Program Requirementsposted by CHRISTIAN LUTJEN on
Hello, we have been trying to get an answer from the USGBC for two days short of a full month now.
Is there a limit to how many products can use the same CSR?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Alexa Stone on
An industry-wide (generic) EPD can be used for up to 10 products listed within the industry-wide EPD, provided that each application has separately reported impacts within the EPD.
Alternative Compliance Path - C&S LEED Threshold reduction
CS-v4 EAp2:Minimum energy performanceposted by MKK LEED on
Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?
LEED BD+C NC or LEED ID+C: CI
posted by Pournamasi Rath on
Hi, I am looking for guidance on the appropriate LEED rating system for my project. This project has 2 buildings - one is NC and the other is renovation of an existing building.