Does a "Hot Zone" in a Fire Station need individual door closers?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Adrienne Franz on
Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus bay, decontamination room, a restroom, tool storage, lawn storage, turnout gear lockers, a janito
Would a fire sprinkler system count as "other process water"
NC-v4 WEc4:Water meteringposted by Cindy Quinn on
Has anyone had success with a fire sprinkler system being one of the subsystems? Would it count as "other process water"?
TIA!
Waste management plan submission with multiple GC's
NC-v4 MRp2:Construction and demolition waste management planningposted by Blake Weaver on
I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different GC.
Number of eligible Innovation credits from Pilot Credits
NC-v4 INc1:Innovationposted by Jason Garvens on
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits?
getting hot water from CHP, but not the power. Can I still get the credit of the power produced?
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hi! My project is getting hot water from the central combined heat and power plant in the campus, but it's NOT getting the electricity from it.
LEED 4.1 Tier 2 & 3 Renewable Energy and District or Campus Thermal Energy (DES)
NC-v4.1 EAc5:Renewable Energyposted by Hans Marsman on
We are working on a building connected to a campus central plant (DES).
50% Unbound
Healthcare-v4 SSc5:Heat island reductionposted by Lene Hill on
What does unbound mean? How is unbound determined?
WE Indoor water use reduction - Detention facility requirements
NC-v4 WEp2:Indoor water use reductionposted by Lawrence Rennell on
We are currently working on 2 small detention facilities (25 beds and 60 beds). Both projects are new construction and are not Retail, school, or hospitality projects.
If a parcel crosses the 1/4 mile radius, does it count?
CS-v4 LTc4:Surrounding density and diverse usesposted by Armond Dai on
On the map I ploted a 1/4 mile radius from the project boundary. There are lot of parcels of buildable land that are partially within the radius and partially outside the radius.
Calculating CO2 setpoint for carbon dioxide monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Edgar Arevalo on
I've been looking at Appendix C of ASHRAE 62.1-2010 for a way, and I keep scratching my head. Does anyone how to calculate for the CO2 setpoint to pursue the carbon dioxide monitoring strateg