Pleased to hear of the extension.

General forums
posted by  Anne Porter  on 

Unfortunately, I have been unable to "convince" a facility manager that LEED EB was worth the cost.

0

preventive maintenance program

EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by  Kimberly Hosken  on 

I am certifying a project following the "streamlined path" as the building was certified LEED Gold NC 2.2.

1
Sat Aug 26, 2017, 3:58 pm

Mechanical Insulation

CS-2009 MRc4:Recycled Content
posted by  Sarah Gagnon  on 

I know MEP components are not included in the MR4 credit. What about piping or duct insulation? Insulation is part of Division 7, so I say it should be included.

1
Sat Aug 26, 2017, 10:56 pm

Minimum Energy Performance Calculator v2009: Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Lund  on 

I believe there is an error in the Minimum Energy Performance Calculator v2009, dated April 18 2016.

1
Fri Jun 24, 2016, 2:58 pm

Campus road

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Susan Di Giulio  on 

We have a project on a university campus. The university maintains the roads on the campus, although there is public access 24/7.

1
Sat Nov 28, 2015, 1:57 pm

Compliance for Existing Site Features

Pilot-Credits PC14:Walkable Streets
posted by  Vicki Rybl  on 

I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.

0

Walking path question

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Chris Miller  on 

Can our walking path that leads to the bus stops go through the buildings parking lot?

1
Mon Mar 21, 2016, 5:53 pm

Critical Path Supply Duct Pressure Drop Calculations

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Bryan Lanier  on 

Currently working on a tenant project. Base building chilled water to each floor supplying DOAS Terminal Units. I'm planning on supplying PD calcs for representative units.

1
Fri Mar 10, 2017, 6:14 pm

Parking for CI 2009 project - LEED project boundary

CI-2009 MPR3:Must use a reasonable site boundary
posted by  Ron Dean  on 

If the Commercial Interior v2009 project has an existing parking that will serve its operations but no construction will be done, should it be included in the LEED project boundary? The CI project

1
Mon Feb 15, 2016, 5:16 pm

Option 3 Strategy '4'

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Gail Napell  on 

For this strategy - if the take back / recycling system costs money (i.e. carpet recycling) does it still count as a strategy?

1