Forum quick links
Pleased to hear of the extension.
posted by Anne Porter on
Unfortunately, I have been unable to "convince" a facility manager that LEED EB was worth the cost.
preventive maintenance program
EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Kimberly Hosken on
I am certifying a project following the "streamlined path" as the building was certified LEED Gold NC 2.2.
Mechanical Insulation
CS-2009 MRc4:Recycled Contentposted by Sarah Gagnon on
I know MEP components are not included in the MR4 credit. What about piping or duct insulation? Insulation is part of Division 7, so I say it should be included.
Minimum Energy Performance Calculator v2009: Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Lund on
I believe there is an error in the Minimum Energy Performance Calculator v2009, dated April 18 2016.
Campus road
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Di Giulio on
We have a project on a university campus. The university maintains the roads on the campus, although there is public access 24/7.
Compliance for Existing Site Features
Pilot-Credits PC14:Walkable Streetsposted by Vicki Rybl on
I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.
Walking path question
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Chris Miller on
Can our walking path that leads to the bus stops go through the buildings parking lot?
Critical Path Supply Duct Pressure Drop Calculations
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Bryan Lanier on
Currently working on a tenant project. Base building chilled water to each floor supplying DOAS Terminal Units. I'm planning on supplying PD calcs for representative units.
Parking for CI 2009 project - LEED project boundary
CI-2009 MPR3:Must use a reasonable site boundaryposted by Ron Dean on
If the Commercial Interior v2009 project has an existing parking that will serve its operations but no construction will be done, should it be included in the LEED project boundary? The CI project
Option 3 Strategy '4'
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
For this strategy - if the take back / recycling system costs money (i.e. carpet recycling) does it still count as a strategy?