IAQ Management Plan and IAQ Management Specification Section
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Bridget Brock on
I am working on a project where LEED was almost an after thought. I was brought into the project just after the 60% submittal.
Roof Area Clarification
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Maggie Hogan Skaug on
Looking for a clarification on the "Roof Area" definition, in particular, what constitutes an "open covered parking structure".
pc14 for Historic School building in urban context
Pilot-Credits PC14:Walkable Streetsposted by Kristian Whitsett on
We were inspired to test out this credit because of the huge increase in students walking to school after we completed a full renovation of a historic school in North Adams, MA.
Option 1 and Option 2?
NC-v4 SSc5:Heat island reductionposted by Jonathan Weiss on
For a project where we're pushing for parking garages for the cars, but have asphalt driveways, can we consider the footprint of the garage as hardscape that meets the requirement?
measuring heat pump load for system submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by ethan adams on
I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.
Canopy to building with wall opening (is it a "complete bldg")?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Lee on
We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.
Upload Documentation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Patrick Stark on
I am doing option 3, approach 1.
Tenant Installed Equipment and Appliances
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by James Keohane on
I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.
Masonry Flash Mastic
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Chris Moore on
Our masonry contractor submitted VOC documentation on Wire-Bond Aqua Flash Mastic with a VOC content of 270 g/L. I am first not sure if this needs to be submitted for IEQc4.1 or not.
NC V4: Thermal Comfort
NC-v4 EQc5:Thermal comfortposted by Erik Gutierrez on
Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. To be specific, the new construction is a restaurant.