43" partitions block views and negate compliance?
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Vanessa Seibert on
I see that there was some conversation on the views credit back in 2011.
"Material Value" in LEED credit calculation
posted by Nasim Daryaee on
Hi every one, I have a general question regards definition of " Material Value" .ie, my structure steel value in the manufacture is 200K and the cost I paid to my sub after fabrication ...
Certification agency meeting the ISO Guidelines
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Stephanie Graham on
Under the requirements of qualifying certification agencies, it reads, "The certification organization follows guidelines for environmental claims and third-party oversight, including ISO/IEC Guide
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
PIf2
NC-2009 PIf2:Project Summary Detailsposted by shaun Andriano on
This might be an easy one... Our PI form 2 was recently not approved following final design review.
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? Thanks!
PIf2- Project Summary Details
NC-2009 PIf2:Project Summary Detailsposted by Karly Michalowski on
What to do if project owner will not supply project budget?
MRpc69 Attainable in the New Construction Project
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Vanessa Cardona on
This credit was readily attainable for a new residential building located in Manhattan. Six streams were recycled by tracking waste throughout the construction phase of the project.
Alternative to OA airflow measurement device at Building AHU
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Kristopher Baker on
So like many on this thread, i have a LEED CI project that is 1/3 of 1 floor and is served by the base building AHU that is outside the scope and LEED boundary of the project.
Air economizers in proposed and baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jeff Riggs on
If air economizers are not required to be modeled in the baseline system due to climate zone (4a) can you model the proposed with economizers if in design and not model economizers in the baseline?