Forum quick links
Fenestratin SHGC for EAp2 baseline and proposed building
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Thanks for the prompt and kind answer, Marcus. One more thing: Is it possible that baseline SHGC can be smaller than proposed one, even if both are below 0.25 (maximum)? Thanks
carpeting and flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Roger Lewis on
Is there a LEED standard for carpet properties or hard surface properties that affect the collection or resuspension of dust?
Exterior No Smoking- Specific Signage Text
Schools-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Kelly Martinez on
We documented a "no smoking" sign (text and image) on the exterior wall of the building vestibule.
Demand Response on Campus applied to CI (2009) project?
NC-v4 EAc4:Demand responseposted by Margaret Montgomery on
We're doing a project that is >75% of the interior of the building (nearly all of it), but is considered CI.
Waste Stream Study: Address top 4 only, or any 4 out of the 5?
Retail-NC-v4 MRp1:Storage and collection of recyclablesposted by Greg Romanczyk on
The credit requirement indicates a waste stream study needs to be conducted to identify the project's top five recyclable waste streams.
Parking Area Clarification
posted by Kristy O'Hagan on
In the latest Update to LEED Interpretation (LI) 10079 & 10080, the 75% maximum limit on area devoted to vehicle storage & circulation has been removed. As of October 1, 2012: So as not to
Upload IEQc3.2-1. Provide the IAQ Management Plan...
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Zach Hoffman on
Hello, I have been successfully completing IAQ Testing under Option 2 for a few years now and always wondered about this section of the credit template.
ECB vs Appendix G
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by MKK LEED on
I am trying to understand whether the modelling for Option 2 of this credit is supposed to be done using the ECB method or Appendix G.
Testing with multiple systems in one space
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nate Steeber on
I've looked deeply into all the comments here, but I can't seem to find an answer - I apologize if this is a repeat, or too simple of a question: My project has many AHUs, in some cases two differ
Future Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I am working on a hangar project.