ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Eligible for Exemplary Performance Credit?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Owen Hyne on
We anticipate meeting/exceeding requirements for SSc6.1 "Quantity Control", but not SSc6.2 "Quality Control".
DDA Boundary
NC-v4 LTc3:High priority siteposted by Trevor Anderson on
Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?
Envelope Categorization
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Russell Philstrom on
Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.
Acoustic Test in the Field
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Holly Van Straten on
I am a manufacturer of HVAC equipment that is installed in a classroom. Due to this prerequisite I get frequently asked if we "meet LEED standards".
If you are already meeting SS c8...
Pilot-Credits SSpc55:Bird collision deterrenceposted by Cynthia Kaplan on
...Then the lighting requirements for SS pc55 should be a foregone conclusion, no?
U-value and SHGC for Baseline Fenestration in ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I am reviewing the residential unit's EAp2 for Hawaii. The U-value and SHGC in ASHRAE 90.1, Table 5.5-1. The title of table (the first raw) says "Assembly Max.
Using interpretation 10203 for a hotel site
NC-2009 PIf1:Minimum Program Requirementsposted by Susan Di Giulio on
We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to regist
Existing Building, Renovations Taking Place Piecemeal
CI-v4 EQc4:Indoor air quality assessmentposted by Sara Zoumbaris on
We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.
Multifamily Buildings
EBOM-v4 WEp1:Indoor water use reductionposted by Zachary Sherman on
For multifamily buildings where the residents are responsible for purchasing and installing fixtures, for Option 1 do I need to survey every fixture in every apartment?