Forum quick links
Common Area Spaces/Tenant Fit Out
CS-2009 EAc1:Optimize Energy Performanceposted by Heather South on
I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space
Material Reuse
NC-2009 MRc3:Materials Reuseposted by Scott Gharda on
I am working on a project where we will be renovating an existing 2 story warehouse to turn it into office space.
Increasing Baseline Static Pressure for Sound Regulations
Schools-NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
We're working on a project where in order to comply with local noise regulation requirements, the Proposed design required indoor air handling equipment with fully ducted exhaust/intake air connect
Commercial Interiors 2009 v3 - Documentation Reuse and Boundary
posted by CHRISTIAN LUTJEN on
Hi all, We are embarking on our office's first LEED Commercial Interiors project. The existing envelope received 2009 v3 LEED Gold for Core and Shell in 2014.
VOC Content allowed per CA Section 01350
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Elizabeth Matthews on
In processing the IEQc4.1 I am running into products that call out the VOC content, but I do not know the limits that need to be met for CA Section 01350. Does anyone know those numbers?
non-inpatient areas
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Erin Holdenried on
I am confused by this credit. Can non-inpatient areas that fall outside the 15' perimeter be excluded?
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
Compliance for Corporate Interiors?
Pilot-Credits EQpc78:Design for active occupantsposted by Rachel Bannon-Godfrey on
Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.
ID credit Green Cleaning Policy without walk-off mats
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rachel Bannon-Godfrey on
We have a project that is not achieving IEQc5 as walk-off mats conflict with the operational aspects of the building. Can we still apply for an ID credit for a green cleaning policy?
CO2 Monitors in Waiting Room Without 4 Walls
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Michelle Halle Stern on
I'm working on a HC interiors project with waiting rooms and nurse stations that have density of 25 people/1000sf, however they do not have 4 walls enclosing the spaces.