Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

MRpc103 Integrative Analysis of Building Materials

NC-v4 INc1:Innovation
posted by  Lisa Bolle  on 

As our project team was performing the analysis of three products, we realized that another potentially useful strategy would be to compare three similar products and use the integrative analysis w

2
Tue Mar 12, 2024, 9:06 pm

High Rise Residential

NC-v4 EAc3:Advanced energy metering
posted by  Megan White  on 

We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with mul

3
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Tue Mar 12, 2024, 3:25 pm

Future open space preservation- Campus project

NC-v4 SSc3:Open space
posted by  Andy Rhoades  on 

My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Tue Mar 12, 2024, 12:50 am

Partial Floor LEED Certification

CI-v4 MPR3:Must comply with project size requirements
posted by  Edgar Arevalo  on 

I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified.  The project space is approximately 52% - 60% of the total floor

0

Existing PV on previously certified project

NC-v4 EAc5:Renewable energy production
posted by  Yu Zhang  on 

I have a project that is a new building located on a previous certified LEED project with PV production.  The previous project had >90% offset by energy use and >100% offset by cost from

10
Wed Mar 6, 2024, 5:20 pm

Waste performance yields a score of zero points in ARC

EBOM-v4.1 MRp3:Waste Performance
posted by  jimmy Adames  on 

Hi, Our building is a very automated distribution center for an apparel company.  Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, a

1
Mon Aug 5, 2024, 7:10 pm

Confirmation of Agent's Authority

LEED v4.1 Discussion Forum
posted by  Aaron Kennedy  on 

We are filling out the Confirmation of Agent's Authority.  Does the agent need to be the LEED Accredited Professional or can it be me, the lowly non LEED certified person?  

8
Mon Feb 26, 2024, 10:56 am

Integrative Process Facilitator

NC-v4.1 IPc1:Integrative Process
posted by  Edward Reifenstein  on 

The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Feb 24, 2024, 2:22 pm

Minimum OA Options

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Courtney Mayes  on 

Hello,  I have a site that has a shared OAD for two units.  The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage.  Even with reduced C

1
Sun Feb 25, 2024, 1:14 am