NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  April Ambrose  on 

A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.

1
Tue Jan 17, 2017, 11:55 pm

Existing Biofuel Station on Campus

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  GTF CPRE  on 

Our project is on a university campus that has an existing biofuel station for fleet vehicles.

1
Thu Apr 2, 2015, 6:03 pm

Building Demoliton outside my LEED Boundary

NC-2009 MRc2:Construction Waste Management
posted by  Faith Wilbert  on 

Hello, I'm currently working on a project where we are building a new dormitory. When the new dorm is up and running the existing dorm down the road will be demolished.

1
Sun Aug 14, 2016, 6:51 pm

3.2 at a Group Project

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Russell Remy  on 

I currently have a group project LEED-CI in which one building has changing facilities and showers meant for both building tenants use.

1
Wed Jun 17, 2015, 7:54 pm

Do classrooms have individual work stations?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Helene Lefkowitz  on 

I'm working on a LEEDv3 university building that is pursuing certification for NC instead of Schools.

1
Wed Jan 18, 2017, 6:29 pm

Shower Requirement for Leasing & Ammenity space of a Res.Bldg

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Aaron McEwin  on 

With reference to LI #10209, I would appreciate clarification on the following: LI#10209:Applies only to mixed use building.What is defined as non-residential component per this interpretation? Wo

1
Fri Nov 27, 2015, 2:26 pm

Flush out by AHU volume or Floor volume?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Aru Sau  on 

In this project, there are three floors ( with multiple rooms with interior walls with doors) with multiple AHUs serving from 100% OA intake to 20% OA intake.

0

Building and Material Reuse

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

I'm selecting Option 3 for building and material reuse.

1
Sat Aug 26, 2017, 12:04 pm

Is there a occupancy % under 100% that is still considered 100%?

EBOM-2009 PIf3:Occupant and Usage Data
posted by  Vanessa Seibert  on 

In our attempt to fill out PI form 3 we are recognizing that completing the form to note every time within 5 years that the 800,000 s.f.

1
Mon Jan 26, 2015, 8:36 pm

Industry benchmark comparison reports

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Omar Delgado  on 

Greetings, I'm trying to find a benchmark comparison report for manufacturing plants but have had no luck so far.

1
Fri Jun 17, 2016, 7:07 pm