Parking Capacity - Police Station
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Joe Malone on
Working on a new police station and trying to find a route to get SSc4.4 (LEED 2009). Anyone have any thoughts? We have public and secure parking which is for police vehicles only.
VRF Systems - Option 1 of EAc1.3
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Roger Carter on
I am looking for some feedback on the interpretation for appropriate zoning and controls. It appears that every solar exposure must have a separate control zone.
Greenguard Gold, SCS Indoor Advantage Gold?
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Do these certifications meet the requirements for furniture?
DES Option 1 - Baseline System Heating Type Clarification
NC-2009 EAp2:Minimum Energy Performanceposted by Mike Ramos on
We're using Option 1 of the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Construction" document to comply with EAp2 / EAc1.
Portable Basketball Floor
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Summer Minchew on
Would a portable basketball floor be considered not "permanently installed" and therefore not subject to credit requirements?
EBOM Solid Waste Management Policy in Medical Office Building
NC-2009 IDc1:Innovation in Designposted by Sara Goenner Curlee on
My project is pursuing LEED NC, and was hoping to use MRp2 as an innovation credit.
Bus Line Rerouting for Adjacent Bridge Construction
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Kevin McNulty on
Hi. My firm is working on a building that will be located right at the foot of a large bridge project that is currently in construction (estimated reopening in a few years).
Ability to make a design final submission
posted by Madhura Dhayagude on
I am a part of this project which was registered 3 years ago with Initial review submitted.
SSc5.2 Project Boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Christopher Widdowson on
If we are using a portion of adjacent Conservation Area to maximize the Open Space via a permanent easement, do we include the easement area within the Project Boundary on all documentation?
CFD Model
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by ESD Engineer on
I'm currently working with a CFD modeler for the contaminants portion of this credit. We're having trouble finding the generation rates per square foot of active contaminant.