Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

DES Option 2 when project contains the DES

NC-2009 EAc1:Optimize Energy Performance
posted by  Stephanie Graham  on 

Project is LEED-NC v2009 project in which a building contains a DES that serves the project building as well as a larger adjacent building.

1
Thu Sep 10, 2015, 3:35 pm

Pot washing sink

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Christine Harvey  on 

I saw a comment on this site that implied the water used for pot washing sinks and kitchen food prep sinks can be excluded from the calculations, can someone verify that for me?

1
Mon Oct 20, 2014, 3:23 pm

Power Line Overhead?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Cindy Quinn  on 

Our LEED boundary has a power line easement running through it. The city's zoning doesn't allow development in this area.

1
Wed Apr 6, 2016, 12:41 am

Resuspension of particles from flooring?

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Roger Lewis  on 

Is there any LEED criteria for type of flooring that is necessary to prevent resuspension of particles from flooring into the indoor atmosphere?

1
Tue Jul 25, 2017, 11:11 pm

Can we write up this plan and use it as the basis for our EBOM?

Pilot-Credits SSpc64:Site improvement plan
posted by  Katherine Carlin  on 

Hi there, We are wondering if we can get a pilot credit for creating this plan by identifying everything that we are doing this year for our EBOM.

1
Mon Jan 26, 2015, 12:43 am

No floor

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  April Ambrose  on 

A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.

1
Tue Jan 17, 2017, 11:55 pm

Existing Biofuel Station on Campus

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  GTF CPRE  on 

Our project is on a university campus that has an existing biofuel station for fleet vehicles.

1
Thu Apr 2, 2015, 6:03 pm

Building Demoliton outside my LEED Boundary

NC-2009 MRc2:Construction Waste Management
posted by  Faith Wilbert  on 

Hello, I'm currently working on a project where we are building a new dormitory. When the new dorm is up and running the existing dorm down the road will be demolished.

1
Sun Aug 14, 2016, 6:51 pm

O+M: Retail or ID+C: CI

LEED Rating System Selection
posted by  Yulia Chen  on 

Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.

0

Sample LEED 2009 Basis of Design Document

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Robert Shields  on 

I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.

1
Tue Apr 7, 2015, 3:46 pm