Forum quick links
Existing Central Plant serving new building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
Hello, We have an existing central plant that will be serving new building. How do we model this? Existing central plant will service one existing building and new building.
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building but with existing central plant that serves also another building. My question is do i have to model part of existing central or whole.
ID credit for college or university
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Cindy Quinn on
Has anyone had luck submitting this credit and/or IEQc9 as an ID credit for a college or university?
TPO Roofing
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?
No irrigation for pre-req
NC-v4 WEp1:Outdoor water use reductionposted by Robyn Dowsey on
I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true
Male occupant usage w/ family rstrm next to gang rstrms
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Renee Shirey on
Since the default assumption is that 100% of male occupants will use a restroom with a urinal, how do you calculate the usage when there is a family toilet (without a urinal) next to the large gang
Building with no FTE
NC-v4 LTc6:Bicycle facilitiesposted by Nathan Gauthier on
Has anybody proposed eliminating showers and / or long-term bike storage in a building with no FTE? We're renovating a small wood-frame classroom building with 8 classrooms.
Option 1 Path 2 Mechanical & Electrical Rooms
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Amy Harmon on
I am working on a project that has multiple AHUs serving different types of spaces and we also have several large mechanical and electrical rooms.
Classification of PVC adhesive and Primer
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Randy Weatherly on
I have classified PVC water pipe glue as "PVC Welding Adhesives" and the Purple PVC primer as "Adhesive Primer for Plastic". Is this correct"