Forum quick links
Major renovation of historic district bldg in historic district
posted by Pamela Smith on
Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.
LEED Project Boundary for Renovation Projects
NC-2009 PIf1:Minimum Program Requirementsposted by Nicholas Klever on
We are in the process of certifying a project that has completed construction. We received a clarification from our LEED Review team requesting to update the LEED project boundary.
Trouble finding comparable projects for recycling rates
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Martin Stowell on
I am working on a C&S project and I am trying to figure out the expected volume of recycling for the building.
Minimum Energy Performance Calculator - Receptacle Equipment
NC-v4 EAp2:Minimum energy performanceposted by Mark Zoeteman on
Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p
What if landscaping isn't installed yet?
EBOM-2009 WEc3:Water Efficient Landscapingposted by Vanessa Seibert on
We are in the PP but do not have our low-water landscaping installed. A contract will be signed to install it prior to the end of the PP. Has anyone obtained the credit this way?
MRp1 Can a designated dumpster serve as my area of recycling?
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Shelly Christman on
Hello All, We have a 140,000 SF shell & Core project that is mixed use 1st floor and office space floors 2-6. We are using LEED 2009 C&S.
LEED Online Not Displaying Multiple Credit Assignees
posted by Peter Warren on
If I am NOT the a project’s LEED Administrator, how can I see the full list of team members to whom a credit is assigned (i.e. when it is assigned multiple people)?
PC 29 Index
Pilot-Credits PC29:Housing and Jobs Proximityposted by Gary Hansen on
We registered for this credit back in 2011 and we are finally completing the project. I think I just need to participate here and complete the online survey.
WELL credits and LEED Innovation points
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Meredith Chambers on
Can a WELL credit be used as a LEED Innovation point in v4? If so, can the list shown in Appendix C, Table A2 of the WELL Building Standard v1 Reference Guide be used to show compliance with v4 Pe
IAQ calculator occupancy designations?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Patricia Andrasik on
I'm working on a dormitory that features 4-bedroom suites that are occupied by 5 people (3 single rooms and one double per suite as well as a living room, shower room, sink/vanity area, and toilet)