Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Is string lighting exempt from the Light Trespass/Uplight requirements.

NC-v4 SSc6:Light pollution reduction
posted by  Summer Gorder  on 

Hi, we have a project where they are using string lighting to light a pathway.

1
Sat Feb 3, 2024, 9:37 pm

Does type of signage matter?

CI-v4 EQp2:Environmental tobacco smoke control
posted by  Edgar Arevalo  on 

Does it matter the type of signage that's displayed at the entries of the building?  I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly

0

Modeling Proposed DHW with Insulation

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi I am Modeling a DHW system and most of my savings are coming from Insulation in the heater tank, now the LEED reviewer said that the savings should be modeled with Exceptional Calculation MEthod

4
Wed Jan 31, 2024, 10:32 pm

Onsite and Offsite Both?

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Umesh Atre  on 

Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?

2
Project Manager
Energy Systems LLC
LEEDuser Basic Member
0 thumbs up
Wed Jan 31, 2024, 3:57 pm

LEED O+M v4 Warehouses and Distribution Centers

LEED Rating System Selection
posted by  Ralph Bicknese  on 

We are evaluating utilizing LEED O+M for Warehouses and Distribution Centers for a 1.5M sf Distribution Center where the all parties are very interested in being able to achieve a LEED rating and r

1
Thu May 9, 2024, 10:10 pm

Hiring - LEED Project Administrator

Help Wanted: LEED-related Jobs
posted by  Trisha Highnote  on 

Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR.

0

Mastic

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Michelle Lockert  on 

Can anyone tell me if it is okay to utilize mastic “outside” the building envelope?

Thank you.

2
Sun Jan 14, 2024, 4:04 am

View Type 1 with non-continuous window glazing

NC-v4 EQc8:Quality views
posted by  Edgar Arevalo  on 

I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous.  The wall space between windows are a

8
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jan 11, 2024, 6:46 pm