Forum quick links
LEED project with associated Parking Deck
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ashley Love on
I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!
School Facilities
CI-2009 SSc2:Development Density and Community Connectivityposted by Neil Rosen on
Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?
Showerhead with multiple settings
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by AtSite Inc on
To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.
Compact Car Spaces
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Allen Cornett on
I have a project that some of the parking spaces that are the shortest distance to the elevator bank are spaces for compact cars.
LEED v4 CI , E&A :AEDG 50% requirements
CI-v4 EAc2:Optimize energy performanceposted by Vinay Shekar on
The tenant space that we are looking to certify for LEED v4 CI is part of an existing building .
Confidential Projects Information Control
posted by Sara Goenner Curlee on
I am working on a v2009 NC project with a client very sensitive to the confidential nature of their work. The project is indicated as private/confidential through LEED Online.
Hardscape for exterior wall pool deck
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Karla Chavez on
Would a white glazed wall tile qualify for LEED credits if placed on the hardscape around an exterior pool deck?
Example of a populated BPDO calculator fro LEEDv4?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jaspreet Pahwa on
Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are noted, compliance is met? Also h
building-height-to-street-width ratio
Pilot-Credits PC14:Walkable Streetsposted by Eric Carbonnier on
How does the building-height-to-street-width ratio promote walkable environments?
Default Tenant Receptacle Loads
CS-2009 EAp2:Minimum Energy Performanceposted by Mary Kay Gonzalez on
On a C&S healthcare building, we simulated the receptacle load based on CS Appendix 2, Table 1, as the appendix directed.