Changes during Design Review
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, We are currently responding to LEED Reviewer comments for a building.
Residential on a university campus.
NC-v4 LTc4:Surrounding density and diverse usesposted by Peter Doo on
How are student residence halls classified on a college campus?
Emergency Lighting within Daylight Zone
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by William Weaver on
I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.
New O & M Starter Kit IN Credits
NC-2009 IDc1:Innovation in Designposted by Kristen Callori on
Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i
Multiple indentical RTUs combined with plenum ducts
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chanyang Shin on
Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?
Hot Water and Chilled Water Primary- Secondary Pumping
NC-2009 EAp2:Minimum Energy Performanceposted by ESD Engineer on
My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various AHU/RTU cooling coils.
Protect or Restore Habitat - 2.5 acre Pond
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Katherine Carlin on
We are restoring a pond by removing invasive plant species and replanting with native plant species.
Commercial Refrigeration Systems
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on
I would like some clarification on what LEED considers a commercial refrigeration system in regards to leak check reports. I have 2 different systems in my plant...
MR c7 forms
NC-2009 MRc7:Certified Woodposted by Mark Ramsey on
As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.
Double Ridership - access to transit station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Erin Holdenried on
If a bus servicing your LEED project connects to a bus transfer station (within 2 miles/10 min) of the project site.