Forum quick links
Steel Studs vs. Track
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Johanna Scogin on
Does the steel stud count as different material than the track?
Classroom Building on a Commuter College Campus
Pilot-Credits PC14:Walkable Streetsposted by Allen Schaffer on
Our 90,000 SF Humanities Building on a commuter college campus was just about the most perfect project for this pilot credit.
Energy and Water Data Reporting
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Yaneth Galindo on
I registered the project in the Energy Start Portfolio website, but I realized the meter I subscribe is for more than one building, I have now water and electrical submeters and I would like to kno
93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?
EBOM-2009 RPc1:Regional Priorityposted by Michelle Bracewell-Musson on
Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.
Policies - credit's pursued
EBOM-v4 SSp1:Site management policyposted by Allison Smith on
I'm looking for some guidance regarding drafting policies. I've downloaded the USGBC templates, however do we need to include sections related to credits that we are not pursuing?
ASHRAE 90.1 Chilled Beams Compliance
posted by Federico Taboada on
How can I know if a Chilled beam system for ventilation complies with the ASHRAE 90.1 2007 minimum efficiency requirements ? It has not been mentioned in the ASHRAE Standard.
Undisturbed site areas within LEED project boundary?
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Edgar Arevalo on
I have a project where a patch of forestry has been removed for a new university building.
LEED CI Regional Priority Documentation
CI-2009 RPc1:Regional Priorityposted by Bethany Beers on
It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.
PTAC Monitoring
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Dutchie Grossweiner on
In a mixed use building, the residential dwelling units are being provided outdoor air via PTAC systems (apartment size determines the number of PTAC units).
green power for residential hi-rise?
NC-2009 EAc6:Green powerposted by Seonhee Kim on
Any proven strategy pursuing green power credit for residential hi-rise project? it is a rental property with separate utility meter to each unit. Any advice would be greatly appreciated!