Forum quick links
Occupancy Counts differ from workstation count significantly
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Vanessa Seibert on
I'm working on a 800,000 s.f. high rise building with 40 tenants.
2009 calculator - "private" bathrooms in a commecial facility
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jessica Hawley on
I have mulit-story office building where the first floor has only one "private" bathroom for guests of the building to use in the lobby.
Reporting through Energy Star Portfolio Manager
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Claudia Galvis on
How often does the Owner need to report the Utility data if using the Energy Star Portfolio Manager to comply with MRP6? The form says on a 'regular basis', but does this mean monthly?
Resilient Design
NC-2009 IDc1:Innovation in Designposted by Deborah Lucking on
We are required to address resilient design (e.g. against sea level rise, storm surge) in our project. Does anyone have any experience or words of advice about this? Thanks!
Default Space Susage Types - are there definitions?
CI-2009 PIf3:Occupant and Usage Dataposted by Stacey Olson on
I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?
LEED approved paints and coatins
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Luis Galvan on
If a lacquer or varnish meets the low VOC criteria required by IEQc4.2 but does not state that it qualifies to meet LEED requirments.
PV system on Conference Center
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Patrick Cellie on
Hi, a Conference Center seeking recertification under EBOM v2009 has an installed PV system that seems to have all the requirements of the pilot credit: - the building doesn't use any of the ener
1-floor renovation in an 2009 EBOM Certified Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by John Krutko on
I am proposing on a project in which the scope is the renovation of a single floor of a 10 story building that is currently LEED 2009 EBOM certified.
No longer required to complete Design prereqs before review?
NC-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed).
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!