Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

SS 7.2 (v2009 C+S) -- Tenant Improvements to Roof

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Justin Oldfield  on 

Our core and shell project has chosen a roofing material compliant with SS 7.2.

1
Fri Mar 18, 2016, 2:46 pm

Retro-Enhanced Commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Christian Pegher  on 

Our project is on hold until the fall. The construction documents are done, and the owner just hired a CxA. They'd like to have the CxA go back through the documents now and provide feedback.

1
Sat Aug 5, 2017, 5:08 pm

Products with Zero-VOCs disclosed by MFG

CI-v4 EQc2:Low emitting materials
posted by  Stacey Olson  on 

If the manufacturer provides documentation indicating the product has zero VOCs, does additional documentation showing compliance w/ CDPH Standard Method V1.1-2010 still need to be provided?

1
Tue Sep 5, 2017, 12:06 pm

Prevention Through Design - LEED Pilot

General forums
posted by  Denise Bender  on 

We have a design review tool for new and existing construction projects that incorporates a decisional aid for identifying Environment, Health, Safety and sustainabiliy issues and what measures are

1
Wed Apr 1, 2015, 12:09 pm

Lighting Levels

Pilot-Credits EQpc78:Design for active occupants
posted by  Henry Richardson  on 

Hello, We received a review comment requesting lighting level diagrams. Are alternatives acceptable, including drawings showing fixture selection or lamp output? Thanks, Henry

0

EQ Space Matrix file on USGBC's website is damaged

General forums
posted by  John McFarland  on 

Would someone be able to share the current April 2015 copy of the EQ Space Matrix on this site without linking to USGBC Credit Resources?

1
Mon Jun 1, 2015, 7:19 pm

Garage/service openings with driveway crossings at sidewalk

Pilot-Credits PC14:Walkable Streets
posted by  Qiongwen Kong  on 

This is in regards to the requirements 6 and 7. 6 - No more than 20% of the street frontage includes garage or service bay openings. Alley access is used instead, if available.

0

Common Area Spaces/Tenant Fit Out

CS-2009 EAc1:Optimize Energy Performance
posted by  Heather South  on 

I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space

1
Mon Aug 31, 2015, 2:27 pm

Material Reuse

NC-2009 MRc3:Materials Reuse
posted by  Scott Gharda  on 

I am working on a project where we will be renovating an existing 2 story warehouse to turn it into office space.

1
Mon Jan 30, 2017, 10:49 pm

LEED Design submital - First Review

General forums
posted by  Bridget Brock  on 

At what point do you make the initial design submittal? I have a project that has the 50% construction documents being currently reviewed by the building department.

0