SS 7.2 (v2009 C+S) -- Tenant Improvements to Roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Justin Oldfield on
Our core and shell project has chosen a roofing material compliant with SS 7.2.
Retro-Enhanced Commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Christian Pegher on
Our project is on hold until the fall. The construction documents are done, and the owner just hired a CxA. They'd like to have the CxA go back through the documents now and provide feedback.
Products with Zero-VOCs disclosed by MFG
CI-v4 EQc2:Low emitting materialsposted by Stacey Olson on
If the manufacturer provides documentation indicating the product has zero VOCs, does additional documentation showing compliance w/ CDPH Standard Method V1.1-2010 still need to be provided?
Prevention Through Design - LEED Pilot
posted by Denise Bender on
We have a design review tool for new and existing construction projects that incorporates a decisional aid for identifying Environment, Health, Safety and sustainabiliy issues and what measures are
Lighting Levels
Pilot-Credits EQpc78:Design for active occupantsposted by Henry Richardson on
Hello, We received a review comment requesting lighting level diagrams. Are alternatives acceptable, including drawings showing fixture selection or lamp output? Thanks, Henry
EQ Space Matrix file on USGBC's website is damaged
posted by John McFarland on
Would someone be able to share the current April 2015 copy of the EQ Space Matrix on this site without linking to USGBC Credit Resources?
Garage/service openings with driveway crossings at sidewalk
Pilot-Credits PC14:Walkable Streetsposted by Qiongwen Kong on
This is in regards to the requirements 6 and 7. 6 - No more than 20% of the street frontage includes garage or service bay openings. Alley access is used instead, if available.
Common Area Spaces/Tenant Fit Out
CS-2009 EAc1:Optimize Energy Performanceposted by Heather South on
I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space
Material Reuse
NC-2009 MRc3:Materials Reuseposted by Scott Gharda on
I am working on a project where we will be renovating an existing 2 story warehouse to turn it into office space.
LEED Design submital - First Review
posted by Bridget Brock on
At what point do you make the initial design submittal? I have a project that has the 50% construction documents being currently reviewed by the building department.