Can the credit be use within the Campus Approach
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Luis Huertas on
Can this credit be used at a campus, if all the buildings are being built at the same time within the same Master Site?
Non regulated items (residential light & receptacle loads)
NC-2009 EAp2:Minimum Energy Performanceposted by Abena Darden on
We are looking at an energy model report for a Residential tower. The project was initially achieving 12% savings.
Submitting for a CIR or LEED Interpretation
posted by Deborah Lucking on
We understand that the only way to submit for a CIR is through the registered project LEED Online platform.
LEEDv4 Homes - Parking Structure
Homes-v4 MPR2:Must use reasonable LEED boundariesposted by Sara Greenwood on
It does not appear that parking structures are required to be included in the LEED-H boundary, however if the structure is being built to service a student housing building and energy modeling incl
Elevator Shafts in high rise condo
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Chris Wisniewski on
I am the HERS rater working on a 80+ story condominium high rise. It is intended to be a "smoking permitted" building. Some of the residential units have in-unit access to the elevators.
Can we use the IEQc4.5 Furniture and Furnishings as an ID credit
NC-2009 IDc1:Innovation in Designposted by Carmen Vidal-Hallett on
Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.
Campus Site Lignting Calcs - again, sorry
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
open grid paving and gravel
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
What qualifies as "open grid paving"? Can a gravel bed designed to be 50% pervious qualify as "open grid paving"? Thanks
Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.