Forum quick links
LEED v4 Heat Island Reduction - include elevator shafts and stairwell enclosures in roof calcs?
NC-v4 SSc5:Heat island reductionposted by Julie Baines on
Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO.
Location of outside airflow measuring station inside the HVAC unit
CI-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine
Pharmacy Mail Order | Buy Xanax Without Rx - Medz Here Drugstore
posted by Benjamin Phelps on
Xanax is a type of medication used to treat mental health conditions such as anxiety, depression, or panic disorder.
One Tenant - two spaces across a public corridor - can this be certified as one project?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Helen Kessler on
The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor. Seems to me this is no different from a tenant that is on multiple l
EPD Stud - Separate products count towards 20+ goal under 1 EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Allison Para on
Hello LEED Pros,
Make Up Air Units Modeling Requirements (System or Process Load) - ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Tran on
Hello,
Water Heater Efficiency per Table 7.8 of ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Tran on
Hello,
owner occupied area only?
NC-v4 EAc7:Green power and carbon offsetsposted by Alfonzo Collins on
I'm working on a residential building with about a dozen apartments and limited common area. The apartments have their own utility meters, sand ownership has no ability to read those meters (
Exemption for workshop spaces?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Adrienne Franz on
We are doing a building where half the building is offices and the other half is workshops for parks maintenence staff. (I'm talking mechanical, carpentry, tree crew).
How set up dummy project without paying the registration fee?
posted by Edward Sager on
Is there a way to set up a dummy project for educational purposes (to learn more about the LEED process) without paying a registration fee?
If yes, could you please let me know how?