Existing Building Demolition
posted by Andrew McLaughlin on
We are working on a proposed new Police Headquarters on the same site as the existing Police Building.
Using LEED version 2.2 approval as a precedent
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Judhajit Chakraborty on
Hello, I am working on a campus project where there is common parking for the project I am working on and another project which is LEED platinum certified under the 2.2 version.
How to apply base ratios for non-specified usage type?
CI-v4 LTc5:Reduced parking footprintposted by Jonathan Weiss on
For a laboratory / office building, how do you apply the baseline? It appears that you pro-rate the usage by area of each space type, but laboratories are not a listed usage type.
Editing Form Values
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Ryan Kurlbaum on
I have uploaded all the necessary documentation and made sure that the excel file "supplemental daylight and views" is properly filled out, however on the credit form the "total regularly occupied
Campus-Wide Recycling Program
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Daniel Montgomery on
I'm working on a new classroom building on a university campus. The university's cleaning service picks up trash and recycling daily from all of the classrooms, hallway receptacles, etc.
O+M: Retail or ID+C: CI
posted by Yulia Chen on
Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.
Sample LEED 2009 Basis of Design Document
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Robert Shields on
I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.
Food Service Equipment
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Rachel Manoguerra on
I am working on a LEED for Healthcare v2009 project, and I'm wondering if I have to track food service equipment?
Assesment rooms at rehabilitation Center
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.
REACH
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jonathan Weiss on
I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m