PI Form4 - Lease Requirement

CI-2009 PIf4:Schedule and Overview Documents
posted by  Ludmilla Pavlova-Gillham  on 

My University (12M GSF, 13 divisions, 54 major business units, over 250 major departments), has a multi-use building (287,000) that is undergoing a commercial retail renovation on the ground floor

1
Wed Dec 30, 2015, 5:02 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Mon Jun 1, 2015, 9:00 pm

tenant requirements to maintain compliance with IEQc8.1 and 8.2

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Gail Napell  on 

Has anyone had comment from GBCI when taking these credits for a speculative C&S office building? We provide a proposed tenant layout that shows the interior complying with these credits.

1
Thu Oct 20, 2016, 2:25 pm

shuttle bus to rail station

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Gail Napell  on 

we have a project with the main entrance 0.3 miles from 4 public shuttle bus stops that provide express connections to a commuter (and regional, and national!) railway station.

0

New to LEED Submitals

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Joel Clonch  on 

I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.

1
Tue Jan 17, 2017, 2:31 pm

The three dimensional orientation of the luminaire

Pilot-Credits SSpc7:Light pollution reduction
posted by  Aly Rawji  on 

Can you please provide a sample for this, what is required for "The three dimensional orientation of the luminaire (plan/ elevation)"?

0

Implementing on a university campus

Pilot-Credits PC14:Walkable Streets
posted by  Dee Spiro  on 

When I searched the forum for insight on how to apply/adapt some of the requirements for a campus setting, the posts were from way back in August 2012.

0

Cooling Towers at Central Plant

NC-v4 WEp2:Indoor water use reduction
posted by  Risto Beatty  on 

If cooling towers are located offsite at a central utility plant, does the project need to comply with the cooling tower requirements of this prerequisite?

1
Wed Aug 30, 2017, 4:13 pm

Bus service in opposite directions

Healthcare-v4 LTc5:Access to quality transit
posted by  Bryan Finnegan  on 

The credit requires "Qualifying transit routes must have paired route service (service in opposite directions)" We have two transit routes that run within the required distance of an entry, but th

1
Wed May 25, 2016, 1:49 am

Pilot Credit 87: Verified C&D Recycling Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  David Dixon  on 

have several project and have had to work with the contractors and their LEED coordinator to select a company that is verified for this credit.

0