Forum quick links
Lighting Controls in Jewelry Store
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by Luke Wild on
We are working on a LEED project for a jewelry store which has millwork with lighting in it all around the store.
Spreadsheet from USGBC is password protected
CI-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Keith Steurer on
Is there any way to modify / add new tabs to the USGBC-Approved Data Template for MPR #6? It seems to be password protected and allows only limited editing.
Crawlspace and Attic Classification
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Chappell on
I am working on an existing building renovation where there is a significant amount of building floor area that is crawlspace and attic area.
Sharing my BD+C exam tips!
posted by Paula Melton on
Hi, all! I wrote up my LEED AP BD+C exam tips in so much detail that we went crazy and decided to turn it into a study guide, workbook, and online practice exam!
LEED for Neighborhood Development + Walkable Project Site
Pilot-Credits PC14:Walkable Streetsposted by Nikki Wildman on
We just wanted to share a little of our experience with this credit.
Existing parking lot, new LEED space
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Susan Reid on
Our project is a build-out in an existing non-LEED building in a suburban office park - there is a shared parking lot for several buildings and we are not adding any NEW spaces.
Move-in versus construction
posted by Mark Donahue on
Is there a system that can be used for a simple move in (furniture only) for a commercial office space in a non-LEED-certified building?
WELL Certification Estimation Calculation
posted by Carina Clark on
Our team is trying to estimate about where our project is in achieving WELL certification (and at what level) prior to registration.
Concrete Regional and Recyle Content
NC-2009 MRc5:Regional Materialsposted by Rick Alfandre on
I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th
NC-v4: Rainwater management
NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des