CI MRc2 Concrete & Brick

CI-2009 MRc2:Construction Waste Management
posted by  Joseph Sneed  on 

I have a project that has a lot of brick & concrete demolition. This will be used as "clean fill" at a Metrofill site located somewhere else and not taken to a "landfill".

1
Mon Nov 10, 2014, 3:22 pm

MPR3 - Hotel in Mixed Use Building

CI-2009 MPR3:Must use a reasonable site boundary
posted by  Sara Zoumbaris  on 

Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants.

0

Hotels: separate surveys & corrective measures 4 guests & FTEs?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Susan Di Giulio  on 

HI, Continuing the Hotel conversation, the 2013 IEQ matrix indicates that guestrooms, front desk and BOH - housekeeping areas should be included for IEQc7.2.

1
Wed Aug 2, 2017, 3:38 am

MRc5 Material Tracking/Documentation

CS-2009 MRc5:Regional Materials
posted by  Maggie Hogan Skaug  on 

RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.

0

Task Lights in Scope

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jonathan Weiss  on 

Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.

1
Mon Nov 30, 2015, 11:56 pm

Dirt road?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  emily reese moody  on 

This is the first time I've had a project that has both existing and new dirt roads that will not be paved, or covered with gravel, or anything else. I'm not really concerned about the SRI aspect (

1
Sat Jan 7, 2017, 10:54 pm

cabinet millwork

NC-2009 MRc7:Certified Wood
posted by  Karl Heitman  on 

We are installing plastic laminate millwork with particle board core which is not FSC certified. Does the cabinet costs need to be counted towards the total wood used in the project?

1
Wed Apr 6, 2016, 6:49 pm

Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Ed Kokosa  on 

I've seen previous versions of this question on the forum and the typical answer is to look at design information provided by diffuser manufacturers. As others have replied back, the standard is to

0

Furniture components assembled on-site

CI-2009 MRc5:Regional Materials
posted by  Eric Thompson  on 

We have a project where elements of the furniture are coming to the jobsite and being assembled there.

1
Sat Nov 15, 2014, 5:44 pm