Accounting for Shower Use by non-building occupants

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Deborah Lucking  on 

We have a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.

1
Tue Dec 1, 2015, 4:18 pm

Phases of construction

Schools-2009 MPR2:Must be a complete, permanent building or space
posted by  Cindy Quinn  on 

I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification.

0

Substantial Renovation - Envelope Modeling

Schools-NC-v4 EAc2:Optimize energy performance
posted by  Kalyan Nishtala  on 

Hi, I am modeling an existing school building which is undergoing substantial renovation. As a part of the renovations, new windows are being added and the grade level is being changed.

1
Tue May 16, 2017, 3:03 pm

Parking spaces

Retail-NC-v2009 SSc4:Alternative transportation
posted by  Megan Bove  on 

Would exterior on-site inventory/display parking of new cars for sale at an auto dealership count towards the total number of parking spots provided?

1
Sat Aug 26, 2017, 11:51 pm

recessed walk off mat

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Bomin Kim  on 

We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.

1
Thu Apr 14, 2016, 11:29 pm

Rainwater Management question

Schools-NC-v4 SSc4:Rainwater management
posted by  Karen Darley  on 

when looking at a site to obtain information about natural conditions with an existing school being torn down and a new school being built-how would you access or would it even make sense to evalua

0

mirror mastics that contain carcinogenic ingredient

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Debra a. Lombard  on 

The two mirror mastics that I found both contain carcinogenic ingredients, however they both meet the VOC limit of 250 g/L.

0

"Preserve from development activity 40% of the greenfield area"

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Natalie Otoole  on 

Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.

1
Fri Jul 31, 2015, 1:20 am

Site Selection

Healthcare-v2009 SSc1:Site selection
posted by  Lan Le  on 

Please let me know the LEED credit or pre-requisite for selecting site that will have least environmental impact. thank you

1
Sun Aug 27, 2017, 12:26 am

Cx - Warranty Review After Building is Sold

NC-2009 EAc3:Enhanced Commissioning
posted by  Andy Smith  on 

We completed fundamental and enhanced Cx for a building in August of 2016 (with the exception of 10 month warranty review).

1
Thu May 25, 2017, 4:16 pm