Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Documentation

Healthcare-v4 MRp3:PBT source reduction - mercury
posted by  David Dixon  on 

Working on a v2009 BD+C project and using the credit as an ID credit looking for information on accepted documentation. Any insight will be helpful

1
Sat Aug 26, 2017, 3:27 pm

aerosol line saver (also posted in IEQc4.1)

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Lyle Axelarris  on 

I also posted this in IEQc4.1 since I do not know where, if anywhere, this product would go: Has anyone considered reporting the use of aerosol "line saver"?

1
Wed Apr 15, 2015, 3:44 am

How is an area/square footage assigned to a tree?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Tricia Loe  on 

I have a plaza with 32 trees, with each in their own tree grate. I am trying to determine how to input this vegetation type into the EPA WaterSense calculator.

1
Fri Jun 16, 2017, 8:07 pm

Envelop Commissioning

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Peter Doo  on 

The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts

1
Thu Mar 3, 2016, 9:36 am

Substantial Completion, C of O, TCO

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Erika Duran  on 

Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in

1
Tue Dec 6, 2016, 9:38 pm

Accounting for shower use by non-occupants

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deborah Lucking  on 

Ours is a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.

1
Mon Jan 4, 2016, 4:54 pm

Existing Building Envelope does NOT Meet ASHRAE 90.1-2007

CI-2009 EAp2:Minimum Energy Performance
posted by  James Keohane  on 

How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures?

1
Tue Jan 26, 2016, 11:02 pm

New wind turbines

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  charles bell  on 

My client has a LEED NC silver award from about 10 years ago.

1
Wed Dec 10, 2014, 5:04 am

Water Quality

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Nathan Anderson  on 

Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.

1
Fri Feb 12, 2016, 5:05 pm

Energy Metering

EBOM-v4 EAc5:Advanced energy metering
posted by  Zachary Hayes  on 

Is it acceptable to use energy monitoring software to meet this credit or does it need to be a physical meter?

1
Wed Jun 22, 2016, 5:02 pm