IECc6.1 Hotel Servery
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Glenn Haydu, AIA, LEED AP on
Our LEED review for the breakfast servery offered in the hotel is that we do not comply with multi-occupant spaces for lighting controls. We offered occupancy sensor with "forced off" override.
Air economizer in baseline model
CS-2009 EAc1:Optimize Energy Performanceposted by Jeff Riggs on
If your climate zone does not require air econmizer for baseline systems (90.1 2007, climate zone 4a) are you allowed to model your proposed systems with economizer, per design and not have economi
Prefinished wood flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Brianna Brandsen on
when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site
IAQ Testing
posted by Roland Jones on
I have been asked to provide IAQ Testing for LDP, and am having trouble finding the distinctions between the normal pre-occupancy sampling for credit 3.2 and the during occupancy sampling of LDP.
Hotel Occupancy
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by jupiter luner on
I've determined the occupancy for a hotel project we are working on based upon LEED interpretation 2706606.
Denial of EA PR2
NC-2009 EAp2:Minimum Energy Performanceposted by Roxanne Button on
A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.
Airflow measurement device serving multiple AHUs?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mike Fortier on
Hello, Is it okay to install one airflow measurment device within an outdoor air intake that serves multiple AHUs or does each AHU need to have its own airflow measurement device? Thanks!
Process Water Reduction
Schools-2009 WEc2:Innovative Wastewater Technologiesposted by Charles Shinneman on
Can this credit be used for process water reduction? Washing machines for example.
Sculpture Lighting
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
LEED for Homes MidRise and Commercial Condo Space
posted by Jennifer Preston on
First, context: We have been hired to certify a community space in the bottom 2 floors+basement of a 5-6 story Multi-Family MIDRise project.