Forum quick links
Hotel Occupancy
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by jupiter luner on
I've determined the occupancy for a hotel project we are working on based upon LEED interpretation 2706606.
Denial of EA PR2
NC-2009 EAp2:Minimum Energy Performanceposted by Roxanne Button on
A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.
Airflow measurement device serving multiple AHUs?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mike Fortier on
Hello, Is it okay to install one airflow measurment device within an outdoor air intake that serves multiple AHUs or does each AHU need to have its own airflow measurement device? Thanks!
Process Water Reduction
Schools-2009 WEc2:Innovative Wastewater Technologiesposted by Charles Shinneman on
Can this credit be used for process water reduction? Washing machines for example.
Sculpture Lighting
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
PLF4 was not approved because ..& recommendation for final submi
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Plf4 was not approved because GBCI is asking int & ext photos & renderings of the building. This was Design Preliminary submission and construction has just started.
Regularily Occupied or not?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Alex Barrera on
I'm working on an industrial building in Virginia. One of the rooms is a Quiet/Sleep room, where employees can rest in between their shifts.
Site adjacent to 5 lane highway - with no On-0ff ramp.
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Joyce Kelly on
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo
Performance Period
EBOM-v4 WEp2:Building-level water meteringposted by Matthew Hanks on
I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?
EAp2 Energy Equipment form
CI-2009 EAp2:Minimum Energy Performanceposted by Steve Zuwala on
When listing non-energy star equipment we enter N/A in the Make or model column.