Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Amphitheater Occupancy

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Peter Doo  on 

Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year over a 24 week period.

0

LEED O&M for building additions

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Steve Gross  on 

I am in the process of documenting LEED O&M credits for a museum that is building an addition.

1
Fri Feb 24, 2017, 8:55 am

Space Type

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saif Abdulameer  on 

Hello, I am working on school that has a study area, a lounge and common area as a part of a vestibule that leads to the outside or a corridor that connects classrooms.

1
Fri Jul 21, 2017, 2:14 pm

Reduction of impervious area

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Danielle Spicer  on 

I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e

1
Thu Feb 5, 2015, 3:46 pm

Master's Research Survey

Pilot-Credits MRpc76:Material ingredient reporting
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.

0

Existing Central Plant serving new building

NC-2009 EAp2:Minimum Energy Performance
posted by  Mital Patel  on 

Hello, We have an existing central plant that will be serving new building. How do we model this? Existing central plant will service one existing building and new building.

1
Tue Apr 21, 2015, 7:39 pm

new building

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Bo Slendak  on 

We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.

1
Wed Jan 18, 2017, 4:14 pm

Existing Central Plant and New building

NC-2009 EAp2:Minimum Energy Performance
posted by  Mital Patel  on 

We have a new building but with existing central plant that serves also another building. My question is do i have to model part of existing central or whole.

1
Wed Jul 8, 2015, 2:32 pm

ID credit for college or university

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Cindy Quinn  on 

Has anyone had luck submitting this credit and/or IEQc9 as an ID credit for a college or university?

1
Sun Aug 27, 2017, 12:11 am

TPO Roofing

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Celimar Fournier  on 

Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?

1
Fri Mar 3, 2017, 6:06 pm