Forum quick links
Amphitheater Occupancy
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Peter Doo on
Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year over a 24 week period.
LEED O&M for building additions
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Steve Gross on
I am in the process of documenting LEED O&M credits for a museum that is building an addition.
Space Type
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saif Abdulameer on
Hello, I am working on school that has a study area, a lounge and common area as a part of a vestibule that leads to the outside or a corridor that connects classrooms.
Reduction of impervious area
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Danielle Spicer on
I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e
Master's Research Survey
Pilot-Credits MRpc76:Material ingredient reportingposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
Existing Central Plant serving new building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
Hello, We have an existing central plant that will be serving new building. How do we model this? Existing central plant will service one existing building and new building.
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building but with existing central plant that serves also another building. My question is do i have to model part of existing central or whole.
ID credit for college or university
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Cindy Quinn on
Has anyone had luck submitting this credit and/or IEQc9 as an ID credit for a college or university?
TPO Roofing
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?