construction completion date is outside of performance period

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Jessica Hawley  on 

We are currently in our performance period for a project where a tenant fit out of a vacant floor is currently in the planning stages & construction may or may not start during our performance

1
Mon Jan 4, 2016, 9:37 pm

Preferred parking on surface lot or in garage structure

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Deborah Lucking  on 

First of all, thanks to all for the lively discussion on LI 10202 (April through Sep 2013).

1
Fri Nov 27, 2015, 4:44 am

Uses in project boundary?

ND-Plan-v4 NPDc3:Mixed-use neighborhoods
posted by  Sarah Kearney  on 

Hi Eliot, Do the uses on Appendix 1 need to be within the district boundary? We have a number of uses that will be within the boundaries but there are already some uses around the project boundary

1
Thu Dec 1, 2016, 5:39 pm

Amphitheater Occupancy for SS and WE

General forums
posted by  Peter Doo  on 

Amphitheater Occupancy Project Location: United States Our project is the back stage area of a seasonal outdoor amphitheater concert venue.

0

Classification of handsinks

CS-2009 WEc1:Water Efficient Landscaping
posted by  Sean Blaevoet  on 

How are "handsinks" classified? Is it lavatory? Is it kitchen sink? Or is it exempt? Or other?

1
Wed Dec 17, 2014, 11:12 pm

v2009 Project to comply using Building Automation System?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sara Greenwood  on 

Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m

1
Wed Jan 18, 2017, 1:14 am

Pre-Owned furniture

CI-2009 MRc4:Recycled Content
posted by  Susan Di Giulio  on 

If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead?

1
Sat Feb 7, 2015, 2:56 pm

Incomplete Space within LEED-CI Multi-Use Building

CI-2009 PIf1:Minimum Program Requirements
posted by  Sara Zoumbaris  on 

Hello, We are working on a multi-use building that will house a hotel, residence, retail and a restaurant.

0

VOC for fire proofing / intumescent sealants

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Stacey Olson  on 

Would fire proofing / intumescent sealants be considered "Other" or "Architectural Sealants"? I did not find it itemized in SCAQMD 1168. Thank you!

1
Wed Aug 31, 2016, 1:21 pm

Modeling HVAC for future un-designed office space

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.

1
Fri Dec 9, 2016, 3:38 pm