Forum quick links
Concrete Formwork
CS-2009 MRc5:Regional Materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Reduce quantity of elevators
Pilot-Credits EQpc78:Design for active occupantsposted by Brenda Parker on
Has anyone done a study to prove that incorporating the features of this credit into their buildings has reduced elevator usage in a high-enough percentage to be able to reduce the quantity of elev
How to Apply Research Park Guidelines when Zoning is silent
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Maggie Hogan Skaug on
A project pursuing LEED CS 2009 is located in a research park and is subject to the research park's design guidelines. Per city zoning, there is no requirement for open space.
Detention Center Perimeter and Recreation Yard Security Lighting
NC-2009 SSc8:Light Pollution Reductionposted by Dranan Sparks on
I have a state owned youth detention center (jail) project in lighting zone LZ1.
Provide the source of data
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Matt Luedders on
Under the lead section, the credit language includes the requirement to "Upload lead documentation.
Regularly Occupied Inspection Bay with Garage Roll-Up Doors
NC-v4 EQc7:Daylightposted by Kristen Magnuson on
Daylighting Community, We are working on a small building located on an airport campus called a Ground Transportation Unit (GTU).
M&V Plan
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Akshay Odugoudar on
Does the M&V Plan for EAc5.2 have to include what tool is being used to calculate the baseline energy use of the building?
construction completion date is outside of performance period
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Jessica Hawley on
We are currently in our performance period for a project where a tenant fit out of a vacant floor is currently in the planning stages & construction may or may not start during our performance
Preferred parking on surface lot or in garage structure
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Deborah Lucking on
First of all, thanks to all for the lively discussion on LI 10202 (April through Sep 2013).
Uses in project boundary?
ND-Plan-v4 NPDc3:Mixed-use neighborhoodsposted by Sarah Kearney on
Hi Eliot, Do the uses on Appendix 1 need to be within the district boundary? We have a number of uses that will be within the boundaries but there are already some uses around the project boundary