Forum quick links
is a tenant lease agreement applicable here?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Alfonzo Collins on
I am working on a C&S office building, and I'm reading differing viewpoints on this credit and IEQc8.2. Must these credits be included in the Tenant Lease agreement?
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
Contacting the USGBC and Combining Tenant Spaces
CI-2009 PIf1:Minimum Program Requirementsposted by CHRISTIAN LUTJEN on
Hello, we have been trying to get an answer from the USGBC for two days short of a full month now.
Is there a limit to how many products can use the same CSR?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Alexa Stone on
An industry-wide (generic) EPD can be used for up to 10 products listed within the industry-wide EPD, provided that each application has separately reported impacts within the EPD.
Alternative Compliance Path - C&S LEED Threshold reduction
CS-v4 EAp2:Minimum energy performanceposted by MKK LEED on
Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?
LEED BD+C NC or LEED ID+C: CI
posted by Pournamasi Rath on
Hi, I am looking for guidance on the appropriate LEED rating system for my project. This project has 2 buildings - one is NC and the other is renovation of an existing building.
Testing of units with the same layout
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ilana Judah on
We are working on a large high-end high-rise residential project with a variety of unit sizes and layouts.
Combination of Survey/Tracking
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jason Cocek on
The building I am working on has a shuttle service that brings employees to work from various city stops as well as local train stations.
LEED-EBOM credit as ID credit
NC-2009 IDc1:Innovation in Designposted by Alfonzo Collins on
I was looking through LEED-EBOM and saw IEQc2.1, Occupant Comfort Survey. This seems like a pretty easy credit to achieve.
Excluding demand for occupancy sensors in retail sales area
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by Eleftherios Zacharakis on
I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor.