Forum quick links
Pursing credit in an existing building
Pilot-Credits EQpc78:Design for active occupantsposted by Dee Spiro on
Our project involves renovating an existing building on a university campus.
Required to use facility weighted average?
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Eileen Gohr on
"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje
Integrative Pilot Credit - Design or Construction Credit
Pilot-Credits PC60:Integrative Processposted by Devki Wright on
Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?
Duct Testing and Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ramon Ramos on
What is the criteria for triggering duct testing and cleaning reports for both plans?
Design Engineer for EAp1 and CxA for EAc3
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Amy Harmon on
I've got a new building that is less than 50,000 SF.
90% controls for open office systems furniture
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Brian VanAllen on
As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?
Multi-family Mid-rise EA Pre-req 1 - Option 2
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Pournamasi Rath on
Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%
feedback
Pilot-Credits EApc65:Monitoring based commissioningposted by emily reese moody on
There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.
Baseline system for hybrid service hot water system
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t
Golf Course Clubhouse Project Advice
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.