Forum quick links
Two new buildings joined by unconditioned walkway
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by P Fanfulik on
I have a new bus garage (maintenance and admin offices) connected to the fuel/wash building by an open air bridge (unconditioned space).
Runoff/Gully Water
NC-2009 WEc1:Water Efficient Landscapingposted by Tamary Alvarez on
Our project's environmental site assessment has documented a gully resulting from the runoff of the adjacent site dumping into our site.
Two lighting related questions
CI-2009 EAp2:Minimum Energy Performanceposted by Ramana Koti on
1. How does one overcome the limitation of number of rows in the ASHRAE Lighting Compliance Documentation PDF form?
Naturally ventilated elevator lobby in mech. ventilated bldg.
NC-2009 IEQc2:Increased Ventilationposted by Lawrence Lile on
I have a very small elevator lobby, which has a little mini-split unit without outside air.
Ongoing Consumables in HC Clinic
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Michelle DiPenti on
Is there a clear answer on which ongoing consumables to include in the policy?
LEED Boundary / Silt Fencing
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Carrie Laurendine on
Currently working on a project that is a large site with an existing building currently on the site.
Indoor/Outdoor Pool
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Tom Liebel on
We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an outdoo
NC V4: Advanced Energy Metering of Entire Building
NC-v4 EAc3:Advanced energy meteringposted by Erik Gutierrez on
Hello all, I'm looking at metering a new construction building with a single controller.
EAp1-1 Commissioning Report Upload Location Missing
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Sam Stoltze on
The new LEED Online interface seems to be missing the ability to upload a commissioning report.
Submitting New Design Credits During Construction Review
posted by Charlie Haas on
I am working on a project that underwent a split review. We have received and accepted our final design review submission.