Forum quick links
Carpooling/preferred parking req for mixed use buildings.
ND-Plan-v4 NPDc5:Reduced parking footprintposted by Emily Smith on
I have a project that is questioning the 10% carpool/shared use vehicle spaces requirement for all non-residential and mixed use buildings.
Total Annual Consumption
CI-v4 EAc3:Advanced energy meteringposted by Deborah Stadler on
Our CI project is not doing an energy model, but using the prescriptive method (AEDG). What is the acceptable way to determine the Total Annual Consumption to confirm uses above the 10% that
Modeling baseline building envelope for CI project, Purchased energy (condenser water)
CI-v4 EAp2:Minimum energy performanceposted by Yousef Abougabal on
Project Type: LEED ID+C (CI) Version 4
Energy & Atmosphere, EAp2: Minimum Energy Performance & EA Credit: Optimize Energy Performance
Solar powered parking lot lights
NC-v4 EAc5:Renewable energy productionposted by Jason Garvens on
Would dedicated solar powered parking lot lights help contribute toward obtaining x% of the buildings annual energy cost covered by renewable energy?
Vegetated buffer space qualifying as accessible space?
NC-v4 SSc3:Open spaceposted by Chris Flint Chatto on
How much of vegetation on either side of path can count as qualifying open space? it is clear from the credit that on site with a path through a garden, the entirety of the garden could quali
Modeling Proposed and Baseline System
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi Everyone, I am working on a 10,000 sqft tenant fit out LEED project, the building is close to 250,000 sqft building with 5 stories.
TI Office Building Modeling Approach for Areas Outside of the LEED Scope
CI-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,
Entire floor area counts if at least 75% has a view?
NC-v4 EQc8:Quality viewsposted by Martha Norbeck on
The v2009 view credit included this provision: "For private offices, the entire floor area of the office may be counted if 75% or more of the area has a direct line of sight to perimeter vision gla
95 percentile calculation
EBOM-v4.1 SSc1:Rainwater Managementposted by Ann Pieper on
The Rainfall Events Calculator, Historical Data tab, shows the 95th percentile storm calculation as a function of TOTAL ANNUAL Precipitation. Is that correct?
showers required in retail
Retail-NC-v4 LTc6:Bicycle facilitiesposted by Deborah Stadler on
For LEED v4 NC Retail are showers required? For LEED v4 CI Retail are showers required? The credit language and guide specifically appear to explicitly exclude showers in CI Retail, but