Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Option 2-measurements

EBOM-v4.1 SSc3:Light Pollution Reduction
posted by  Ann Pieper  on 

Where exactly do should the Option 2 measurements be taken?  i.e. a certain distance above the light source? on the roof?  

1
Wed Jul 12, 2023, 7:07 pm

Documentation for No Cooling Tower

Pilot-Credits WEpc94:No Cooling Tower
posted by  Marelle Davey  on 

Hi everyone,

Just wondering what documentation have folks used to achieve this credit? Is any documentation required besides mechanical drawings? 

Thanks!

2
Sustainability Consultant
WSP
LEEDuser Expert
0 thumbs up
Tue Mar 14, 2023, 8:20 am

Integrative Process Facilitator

LEED v4.1 Discussion Forum
posted by  Edward Reifenstein  on 

The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Sun Mar 12, 2023, 3:53 am

INpc138 Safety First Pilot Credit Transition

Pilot-Credits INpc138:Managing Indoor Air Quality for Infection Control
posted by  Barry Abramson  on 

We have pursued this pilot credit several times for client buildings. It was extremely relevant during the height of the pandemic but has ongoing importance.

0

Recertifying a leased building

LEED Rating System Selection
posted by  Bill Potter  on 

Our company leases an office building where we are the sole tenants of the buidling.

1
Thu Mar 9, 2023, 12:54 am

Listing the TVOC Ranges

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Summer Gorder  on 

For the CDPH Standard Method v1.2-2017 evaluation In V4 you had to specify the TVOC ranges: 0.5 mg/m3 or less, between 0.5 and 5 mg/m3, or 5 mg/m3 or more.

1
Thu Mar 2, 2023, 7:12 pm
4
Thu Mar 2, 2023, 3:23 pm

Street Light BUG Rating

NC-v4 SSc6:Light pollution reduction
posted by  Danielle Waters  on 

If Street Lights on the public sidewalk adjacent to public streets are within project scope and LEED Boundary, are they required to comply with BUG Rating?

4
Tue Feb 14, 2023, 9:15 pm

Acoustic Performance Credit for Residences

NC-v4 EQc9:Acoustic performance
posted by  Andrew Parise  on 

Two aspects of this credit seem to make it not achievable for new residential buildings - Reverberation Time <0.6 seconds for residences, and STCc 50 from residences to corridors.

3
Thu Feb 9, 2023, 9:20 pm