Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Wall Components

NC-v4 EQc2:Low emitting materials
posted by  LUCY WILLIAMS  on 

When reporting for the wall, ceiling category under Option 1, do all of the interior partition components need to be complaint- the gypsum board, the tape, the joint compound, the studs and the pai

18
Director of Sustainability
Walker Architects
LEEDuser Premium Member
3 thumbs up
Fri Jan 28, 2022, 3:56 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Chris Lombardo  on 

The project team pursued this pilot after achieving the MRcBPDO EPD/HPD credits, which allowed us to better understand the lifecycle of each product we anayzed from an environmental and human healt

1
Fri Apr 8, 2022, 1:44 pm

Legal Wood - Wood Harvested on-Site?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Vincent Pieri  on 

We are working on the modernization of the Visitor's Center at the El Yunque National Rainforest in Puerto Rico.  El Yunque is a USFS National Park, and the forest is managed by the USFS and U

0

Calculator Question

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Catherine Blakemore  on 

Should joint compound and any related adhesives and sealants also be listed in the wall panels, insulation, ceilings categories - or are they only listed on paints/coatings and adhesives/sealants c

2
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Fri Jan 21, 2022, 5:25 pm

DEMOUNTABLE CEILINGS

CI-v4.1 MRc2:Interiors Life-Cycle Impact Reduction
posted by  Brian Kish  on 

The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jan 19, 2022, 4:09 pm

Access Point to an Active Freight Rail Line

Warehouses-NC-v4 LTc4:Surrounding density and diverse uses
posted by  Jonathan Payne  on 

How is "access point" defined for this credit. Is it simply a crossing? It is a more involved distribution site?

3
Wed Jan 19, 2022, 3:23 pm

Shuttle Bus to Station Still OK?

CS-v4 LTc5:Access to quality transit
posted by  Brian Salazar  on 

Under v3, it was possible for projects outside the 1/2 mile walking distance to train transit to meet the credit via shuttle service (public or private), as long as the shuttle was within 2 miles d

3
Tue Jan 18, 2022, 7:12 pm

Electric Vehicle -required project documentation

NC-v4.1 LTc8:Electric Vehicles
posted by  Michelle DeLora  on 

I have a client asking me about Option 2 - which is ESVE ready for 10% of parking. In the online summary of the credit it does not go into the required uploads.

1
Mon Feb 14, 2022, 7:21 pm
3
Thu Jan 13, 2022, 6:41 am

Non default use time for lavatory faucets

NC-v4 WEc2:Indoor water use reduction
posted by  Ruju Rathod  on 

 We would like to use a non default lavatory faucet duration of 15 seconds instead of the 30 seconds. 

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Jan 12, 2022, 5:46 pm