FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Table 1.4

I have couple of questions about filling table 1.4.7: 1- Table 1.4.7A asks for the total cooling capacity, I use HAP 4.6 and the cooling capacities are calculated according to ASHRAE 90.1. Shall I run the simulation and then get the output results? 2- Table 1.4.7B, I am not sure of some system inputs yet in the proposed model, so I use ASHRAE 90.1 and let the software calculate. Shall I fill the table with the software results? Will it still be accepted although it is mentioned that all inputs should be consistent with the Proposed energy model andthe mechanical drawings and equipment schedules submitted to LEED ONLINE. Note: HAP output cooling capacities are away smaller than my actual equipments capacities used in the Proposed model. Will I receive a comment on this?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 09/09/2014 - 18:04

1. Yes, the cooling capacity HAP calculated would be the input. 2.You should be virtually certain about the inputs for your proposed model before you do the final model for LEED. The software should not auto-size anything. Whether it will be questioned depends on the degree to which the input variable is off and which particular input is in question. If the system capacity is slightly off it should be fine. If the fan power is way off it will be questioned. Note. If they are way smaller then it will probably be questioned. Always model the Proposed as designed. Do not auto-size anything.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.