Hello - does anyone know if this credit can be achieved via the BUG method v4 option? Or must the requirements be met with a photometric plan? Seems silly to have to do v3 documentation for a credit that was achieved under v4. Thanks!
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up