Warehouses-NC-v4.1 LTc8: Electric Vehicles

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Option 1. Electric Vehicle Charging (1 point)
Provide an on-site fleet with at least one yard tractor that is powered by electricity and provide on-site charging for the vehicles. OR
Option 2. Reduced Truck Idling (1 point)

Provide an electrical connection for at least 50% of all dock door locations and/or truck parking locations to limit truck idling on the site.

Provide signage to communicate a reduced idling policy.

See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

25/07/2019– Updated: 01/03/2021
Rating System Correction
Description of change:
100002267 Update EVSE requirements

Revise the first sentence in the third bullet under "The EVSE must" to read as " Be vehicle to grid connected (e.g. ISO 15118 compliant) and capable of responding to time-of-use market signals (e.g. price). "

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
09/11/2020– Updated: 25/11/2020
Rating System Correction
Description of change:
100002435

Under the Warehouses and Distribution Centers adaptation, under Option 2. Reduced Truck Idling after "all dock door locations"insert "and/or truck parking locations" and after "to limit truck idling" delete "at the dock" and replace with "on the site."

After the first sentence, add the following language in a new paragraph:

"Provide signage to communicate a reduced idling policy."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
10/01/2020– Updated: 10/01/2020
Rating System Correction
Description of change:
100002331 EV V2G minor update

Under "The EVSE must:" revise the first sentence of the third bullet to read as "Be capable of responding to time-of-use market signals (e.g. price). "

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »
Guest expert

Marilyn Specht

LEED AP (ND, O+M), WELL AP, LFA, Fitwel Ambassador, EcoDistricts AP

SmithGroup
Senior Principal | Director of Sustainability Integration

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Option 1. Electric Vehicle Charging (1 point)
Provide an on-site fleet with at least one yard tractor that is powered by electricity and provide on-site charging for the vehicles. OR
Option 2. Reduced Truck Idling (1 point)

Provide an electrical connection for at least 50% of all dock door locations and/or truck parking locations to limit truck idling on the site.

Provide signage to communicate a reduced idling policy.

See all forum discussions about this credit »

Addenda

25/07/2019– Updated: 01/03/2021
Rating System Correction
Description of change:
100002267 Update EVSE requirements

Revise the first sentence in the third bullet under "The EVSE must" to read as " Be vehicle to grid connected (e.g. ISO 15118 compliant) and capable of responding to time-of-use market signals (e.g. price). "

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
09/11/2020– Updated: 25/11/2020
Rating System Correction
Description of change:
100002435

Under the Warehouses and Distribution Centers adaptation, under Option 2. Reduced Truck Idling after "all dock door locations"insert "and/or truck parking locations" and after "to limit truck idling" delete "at the dock" and replace with "on the site."

After the first sentence, add the following language in a new paragraph:

"Provide signage to communicate a reduced idling policy."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
10/01/2020– Updated: 10/01/2020
Rating System Correction
Description of change:
100002331 EV V2G minor update

Under "The EVSE must:" revise the first sentence of the third bullet to read as "Be capable of responding to time-of-use market signals (e.g. price). "

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »
Guest expert

Marilyn Specht

LEED AP (ND, O+M), WELL AP, LFA, Fitwel Ambassador, EcoDistricts AP

SmithGroup
Senior Principal | Director of Sustainability Integration