Revise the first sentence in the third bullet under "The EVSE must" to read as " Be vehicle to grid connected (e.g. ISO 15118 compliant) and capable of responding to time-of-use market signals (e.g. price). "
Warehouses-NC-v4.1 LTc8: Electric Vehicles
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Electric Vehicle Charging (1 point)
Provide an on-site fleet with at least one yard tractor that is powered by electricity and provide on-site charging for the vehicles. OROption 2. Reduced Truck Idling (1 point)
Provide an electrical connection for at least 50% of all dock door locations and/or truck parking locations to limit truck idling on the site.
Provide signage to communicate a reduced idling policy.
See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Addenda
Under the Warehouses and Distribution Centers adaptation, under Option 2. Reduced Truck Idling after "all dock door locations"insert "and/or truck parking locations" and after "to limit truck idling" delete "at the dock" and replace with "on the site."
After the first sentence, add the following language in a new paragraph:
"Provide signage to communicate a reduced idling policy."
Under "The EVSE must:" revise the first sentence of the third bullet to read as "Be capable of responding to time-of-use market signals (e.g. price). "
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Electric Vehicle Charging (1 point)
Provide an on-site fleet with at least one yard tractor that is powered by electricity and provide on-site charging for the vehicles. OROption 2. Reduced Truck Idling (1 point)
Provide an electrical connection for at least 50% of all dock door locations and/or truck parking locations to limit truck idling on the site.
Provide signage to communicate a reduced idling policy.
See all forum discussions about this credit »Addenda
Revise the first sentence in the third bullet under "The EVSE must" to read as " Be vehicle to grid connected (e.g. ISO 15118 compliant) and capable of responding to time-of-use market signals (e.g. price). "
Under the Warehouses and Distribution Centers adaptation, under Option 2. Reduced Truck Idling after "all dock door locations"insert "and/or truck parking locations" and after "to limit truck idling" delete "at the dock" and replace with "on the site."
After the first sentence, add the following language in a new paragraph:
"Provide signage to communicate a reduced idling policy."