Forum discussion

EBOM-2009 IEQp1:Minimum IAQ Performance

Exhaust System test for pressurized buildings with no exhaust

Hi all, We have an existing building built in the early 1900s with three 100% make up air units supplying fresh air with no exhaust. The building is pressurized and fresh air exits through the building envelope. We have taken supply air measurements. What are the EQp1 guidelines for exhaust system tests on pressurized buildings without exhaust fans? There are four small evacuation fans for each bathroom which evacuate less than 5% of the total supply air. Thank you for your help with this question.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 06/19/2012 - 15:02

It sounds to me like you would test for proper functioning of the evacuation fans and then include a narrative with the prerequisite submittal summarizing the building's strategy related to pressurization and exhaust.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.