Say you have a fairly complex project, but the facility engineers only want to sub-meter 7 electrical systems for measurement and verification. The rest of the energy will be monitored through the utility meters and calibrated to the M&V plan. Would this be option B, D,a hybrid of both or unacceptable for this LEED credit?