Qualify for Option 3 Brownfield Remediation???

The project conducted a Phase I ESA and concluded that there maybe potential for chemical vapor intrusion to indoor air from off-gassing associated with the groundwater plume, therefore a phase II ESA on soil gas investigation is conducted. However, Phase II ESA concluded that the groundwater plume is not volatilizing at concentrations that would pose a human health risk from a vapor intrusion standpoint. And did not require for a remediation. Does the site qualified to claimed Option 3 Brownfield Remediation as the site has already been completely assessed?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Sat, 08/26/2017 - 12:29

No, as no remediation was required or performed.