We received a comment that we need to include system single-line diagrams in our systems manual. Can anyone clarify what the GBCI wants? A duct single line or the HVAC system single line? Thanks,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 10/28/2013 - 20:25

Typically we start with the contract document diagrams, and often ask the design team to simplify them from “construction” documents to operations documents. If there are not good control diagrams, then we will use the control system submittal diagrams for things like AHU’s and other devices. Some projects have very good airflow diagrams that show schematically all the air handling and distribution. A very few times, we have had to develop something separate. To date, we have not gotten this comment.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.